MapLink™ | Procedures | Wind Energy Conversion System (WECS)

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Wind Energy Conversion System (WECS)
(1) If hookup to the PECO system is proposed, electrical plans must be prepared by a certified electrical engineer, at the applicant's expense, and submitted to PECO for approval, which must be obtained.
(2) Subject to review and approval by the Township Engineer, the design of a proposed WECS shall be such that it will operate safely, without loss of structural integrity, under the following conditions:
(a) Loss of utility power (shall not backfeed dead utility line).
(b) Blade imbalance (shall support added blade weight of at least 10%).