MapLink™ | Procedures | Wood-Fired Boilers

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Wood-Fired Boilers
A site plan, prepared, signed, and sealed by a qualified professional licensed in the Commonwealth of Pennsylvania, shall be submitted, which identifies property lines, lot area, location of existing natural and man-made features, location of the proposed wood-fired boiler, ownership information for adjoining properties, and setback measurements from property lines, street lines, and occupied buildings.

As part of the special exception application, the Zoning Hearing Board may attach reasonable conditions and safeguards.

A wood-fired boiler system shall comply with all applicable state construction and electrical codes and the National Electrical Code®. Prior to issuance of a building/zoning permit for installation of such a boiler, the applicant must submit to Middletown Township all documentation required by the Middletown Township Building Code Official to verify that the design of the system complies with the Pennsylvania Uniform Construction Code (UCC). Design information must be signed and sealed by a licensed professional engineer in the Commonwealth of Pennsylvania and/or the equipment manufacturer.

See § 500-2903D for complete, detailed information on wood-fired boilers.

See Applying For a Permit for more information.
See Building and Zoning for more information on documents, forms and permits.